WORKS IN PROGRESS

CONSTRUÇÃO E AMPLIAÇÃO DE 6 (SEIS) ESCOLAS ESTADUAIS DE TEMPO INTEGRAL – BREJÕES (BA)

Uma importante contribuição da SIAN para a educação na Bahia está na entrega de estruturas modernas de 6 unidades escolares de tempo integral, localizadas nos municípios de Brejões, Ilhéus, Maracás, Marcionílio Souza e Ubaíra. As unidades contam com 8, 12, 24 ou 34 salas de aula bem equipadas, com infraestrutura para ar condicionado, biblioteca, salas [...]

See more

Prado Valadares General Hospital

The building construction will have five new buildings, including a castle-like structure, which will house the hospital’s new pediatric unit. This structure will have seven floors where there will be installed 10 Intensive Care Unit (ICU) pediatric beds. Four other buildings are also part of the project: The waste shelter; The LPG plant; The power [...]

See more

Expansion of Ipiaú General Hospital, paving in cobblestone and drainage of roads

The project foresees the expansion of a total of 1,591.20 m2 of the hospital’s built-up area, thus contemplating the construction of 02 new blocks for the main emergency building, in addition to a third building for medical comfort. The project also foresees the construction of a bridge connecting the units, the replacement of the current [...]

See more

Implementation of Bahia Orthopedic Hospital and Bahia Education, Innovation and Training Center

The work to implement the Bahia Orthopedic Hospital – Hoba and the Bahia Education, Innovation and Training Center(Ceinfor) foresees the renovation, expansion and construction of new buildings, within the healthcare proposal and needs programs, from the Health Care Establishment – EAS and Teaching Institution. Bahia Orthopedic Hospital and Bahia Education, Innovation and Training Center are [...]

See more

New Salvador Bus Terminal

In the district of Águas Claras, on the margin of BR-324 Highway, the new Salvador bus terminal will be installed, in a 200 thousand m2 area. The investment in the new Salvador bus terminal totals R$ 120 million. The total duration of the work will be 24 months and the new bus terminal project foresees [...]

See more

Integrated Center for Public Security (CISP)

The construction of the Integrated Center for Public Security (Centro Integrado de Segurança Pública – CISP), in Fortaleza, will host the commanders of Ceará’s security forces. This first phase will be used to build the headquarters of the Military Fire Department (Corpo de Bombeiros Militar – CBMCE), of the Integrated Intelligence Center, Community Center, other [...]

See more

JUAZEIRO DO NORTE CABLE CAR

The city of Juazeiro do Norte, in Ceará, will have a cable car to further boost religious tourism and local economy in the region, which already receives 2.5 million visitors per year. The project of Ceará Tourism Department (Setur) will connect Romeiros station to Horto station. Also, some urbanistic interventions will be made in the [...]

See more

CULTURAL CENTER OF CARIRI

One more equipment to integrate the list of cultural options in the Cariri region, in Ceará. The Cultural Center of Cariri (CCC) will compose Secult-CE’s Network of Cultural Equipment and is part of a goal of Law 16.026/2016 of the State Plan of Culture for the implementation of cultural centers in State’s countryside. The Cultural [...]

See more

MJA LOGISTICS COMPLEX

MJA is a logistic condominium with excellent construction standards and ready to meet all of your company’s demands. The work is planned to ensure greater efficiency, operational agility, and safety, with lower investment. All of that close to the main production and distribution centers in Bahia. The MJA Logistics Center is part of a large [...]

See more

BRESCO BAHIA – LOGISTICS CONDOMINIUM

Located about 30 km from downtown Salvador/Bahia, the Bresco triple-A logistic condominium, with 56,113m² of gross leasable area, will undoubtedly be a reference in the northeastern market. Bresco Bahia has two warehouses leased to the e-commerce giant, Mercado Livre, and delivered by Andrade Mendonça, nowadays SIAN Engenharia, in 2020. Due to the success of the [...]

See more

MACROECONOMIC INDICATORS

• Euro Exchange Rate: R$ 56    • Dollar Exchange Rate: R$ 66