OTHER WORKS

New Salvador Bus Terminal
In the district of Águas Claras, on the margin of BR-324 Highway, the new Salvador bus terminal will be installed, in a 200 thousand m2 area. The investment in the new Salvador bus terminal totals R$ 120 million.
The total duration of the work will be 24 months and the new bus terminal project foresees a structure more modern and integrated with the capital’s transportation system. Compared to the current bus station, the new terminal will triple in size, from 22 thousand m2 to 70 thousand m2.
The conceptual project foresees a new, more modern and environmentally sustainable bus terminal, including water reuse and solar energy generation. It will also have a very high ceiling height, meaning acoustic and thermal comfort, everything within the most rigorous standards and with differentiated engineering.
Viracopos Airport – Expansion
SIAN Engenharia was responsible for the expansion work of the Viracopos Airport, in Campinas. The construction was delivered in 2014 and has a built area of 171,000.00 m2.
Integrated Center for Public Safety
A work linked to the Bahia Public Safety Department, the modern Integrated Center of Public Safety was delivered in 2015, in a built area of 13,231.34 m².
MJA Logistic Center
MJA Logistic Center, in Salvador, is under construction, and has a built area of 88,264.20 m2.
Hotel Pestana Lodge
Inaugurated in 2008, Hotel Pestana Lodge is located in Salvador and has a built area of 9.685,00 m².
Pedestrian overpass – Salvador Shopping
Construction of a new metallic 200-meter-long pedestrian overpass, connecting the Salvador Shopping to the local subway station.
New pediatric unit of Prado Valadares General Hospital
The hospital will have five new buildings, including a castle-like structure, which will house the hospital’s new pediatric unit. This structure will have seven floors where there will be installed 10 Intensive Care Unit (ICU) pediatric beds.