New Salvador Bus Terminal

In the district of Águas Claras, on the margin of BR-324 Highway, the new Salvador bus terminal will be installed, in a 200 thousand m2 area. The investment in the new Salvador bus terminal totals R$ 120 million.
The total duration of the work will be 24 months and the new bus terminal project foresees a structure more modern and integrated with the capital’s transportation system. Compared to the current bus station, the new terminal will triple in size, from 22 thousand m2 to 70 thousand m2.
The conceptual project foresees a new, more modern and environmentally sustainable bus terminal, including water reuse and solar energy generation. It will also have a very high ceiling height, meaning acoustic and thermal comfort, everything within the most rigorous standards and with differentiated engineering.

MACROECONOMIC INDICATORS

• Euro Exchange Rate: R$ 56    • Dollar Exchange Rate: R$ 66